Precautions for installation of shower head
  • Date:2024-11-25
  • Read:295
1. The distance between the hot and cold water outlets should be 13-15/cm and parallel and perpendicular. The thermostatic showerhead requires that the water outlet must be left hot and right cold. The water outlet cannot be recessed into the tile surface by more than 0.5cm.
2. Drain the water for 15 seconds, clean the sediment and impurities in the pipeline, and avoid blocking the valve core.
3. When installing the main body, pay attention to checking for a 6-point sealing gasket. When fixing the nut, a pad must be used to prevent scratching the surface.
4. Open the water valve and check for any water leakage at the curved connection and the water outlet of the main body.
When drilling holes for fixed poles, it is necessary to inquire with the customer whether there are water pipes or wires at the drilling location to avoid breaking the pipeline and causing unnecessary losses.
When inserting the upright pole, attention should be paid to whether the sealing O-ring is deformed, and the overlap of the two pipes should be deep enough to prevent water leakage caused by too short overlap.
7. Lock the pull screw of the upright pole to prevent excessive water pressure from rushing out of the pole and damaging the customer's ceiling.
8. After installation, it is necessary to check again for any water leakage or seepage at each interface.
Prev

Careful maintenance of faucets